Between May 14th and 22nd, the monastery underwent exterior wall repairs, including gap filling, waterproofing, and eave installation to prevent water damage.
These repairs successfully addressed the longstanding issue of water seepage through the interior walls into the basement.
Source: Metropolis of Korea